-
The production structure is marked by small, medium-sized and large jobs
-
In addition to repeated jobs, individual jobs are accepted
-
The planning horizon for jobs is longer then one day
-
Material storage is large
-
Demand for high production
-
Machine utilization is importent
-
The goal is the central control of several machines by one operator
-
To reduce cost, flexible night and weekend production with minimal manpower is desired


